To set the Forcecast Mode please also read 3.1.5.1 2 Slot sizes, Forecast Mode, Roadblocking (DFP)..
Availability Check behavior
- When the campaign item level start date date is in the past we we now submit start date "start now" with Forecast by Prospective LineItem to DFP
- When the campaign item level start date date is in the future we we submit the actual start date with Forecast by Prospective LineItem to DFP
Campaign item item has been transferred to to the DFP
Type of Forecast | CI start date in the future | CI start date in the past |
---|---|---|
Add Item | n/a | n/a |
optimize/change Item (Edit over LineItem) | Forecast by Prospective LineItem | Start now Forecast by Prospective LineItem |
optimize/change Item (Optimizer) | Forecast by Prospective LineItem | Start now Forecast by Prospective LineItem |
Add Item over Optimizer | Forecast by Prospective LineItem | Start now Forecast by Prospective LineItem |
Campaign item item has not been transferred to to DFP
Type of Forecast | CI start date in the future | CI start date in the past |
---|---|---|
Add Item | Forecast by Prospective LineItem | Use immediately plus Warning |
optimize/change Item (Optimizer) | Forecast by Prospective LineItem | Start now Forecast by Prospective LineItem |
Add Item over Optimizer | Forecast by Prospective LineItem | Start now Forecast by Prospective LineItem |
optimize/change Item (Edit over LineItem) | Forecast by Prospective LineItem | Use immediately plus Warning |